The first of two purchased by Robert Dunn were erected onto the prepared plinth wall at the end of May 2015. I am pleased to be able to say Robert and a couple of neighbours managed the task in two (very wet) days with a little help and supervision from myself. Robert is looking for volunteer help to install the straw bales and later there will be the second building. Both are to be holiday lets so if you fancy a try in a strawbalehouse…….
The location, as can be seen in the pics, is to die for.
2nd cruck up and braced.
End of the first day No 6 done.
Assembling two rib beams to make the next cruck.
End of day two -
Location location location.
Beautiful setting..
End of day 2.
Motley, bedraggled crew.
Now for the bales